Engineering Case Studies
Quicksearch
Search Filters

Transfer Chute Plugging Solved at Iron Ore Export Terminal
A major iron ore exporter in South Africa was experiencing major delays in the material ...

Transfer Chute Plugging with Sticky Limestone/Clay Mix
A major cement manufacturer in South America was experiencing transfer chute plugging with a highly ...

Coal Feeding: Pressure-Sealing Solids Pump® Improves Feed
At Lone Star Industries’ Cape Girardeau, Missouri cement plant, reliable coal feed to the kiln ...

Fixing Costly Limestone Flow Problems at Titan Cement
Titan America manufactures Portland cement at their Medley, Florida USA plant, and in June 2004 commissioned ...

Cohesive Clay and Limestone Raw Material Handling at Cemex
Cemex produces over 1 million metric tonnes of cement per year at their Clinchfield, Georgia (USA) ...

Alumina Trihydrate Flows Reliably with New Silo Design
Kaiser Aluminum & Chemical Corp. produces alumina trihydrate which is calcined to make alumina, or ...

Silo Design for Handling Purified Terephthalic Acid (PTA)
The Need A client of Jenike & Johanson was expanding storage and handling capabilities for ...

Fluidization Needed to Achieve Reliable Fine Powder Flow
Manufacturers of asphalt roofing shingles often use fine, hot limestone as filler with liquid asphalt. ...

Fluidized Handling of Detergent Improves Production Capability
Jenike & Johanson was asked to design a surge bin for a laundry detergent manufacturer ...

Mt. Storm Station (Dominion) Coal Handling Problems Solved
The Need Dominion’s Mt. Storm ( Dominion ) Power Station in West Virginia has three coal-fired ...

Coal Handling Problems Solved at Northern States Power
The Need Northern States Power (NSP) has a 384 megawatt coal-fired power plant in Minneapolis, Minnesota ...

Fixing Chute Plugging Problems at Pet Coke Shipping Terminal
The Need A major US conglomerate ships petroleum coke throughout the Pacific Rim. Delays in ...