Skip to content
  • Contact
    1-978-649-3300
    • Massachusetts, USA: 1-978-649-3300
    • California, USA: 1-805-541-0901
    • Texas, USA: 1-281-921-1998
    • Viña del Mar, Chile: 56-32-2690596
    • Toronto, Canada: 1-905-694-9769
    • Perth, Australia: 61-8-9277-3303
    • Vinhedo, Brazil: 55-19-3886-1179
  • Calendar
    EN
    • Español
    • Français
    • Deutsch
    • Português
    • Chinese
    • Hindi
    Search
home Jenike & Johanson
  • Solutions
    • Solutions
    • Solve or Prevent Poor Flow
    • Address Process Non-Uniformity
    • Cure Segregation & Improve Blending
    • Investigate Silo or Equipment Failures
    • Reduce Product Non-Uniformity
  • Industries
    • Industries
    • Mining & Minerals
    • Chemicals
    • Pharmaceuticals
    • Food & Beverage
    • Pet Food
    • Plastics
    • Energy & Power
    • Glass & Ceramics
    • Environmental
    • Powdered Metals
    • Consumer Products
    • Cement
    • Biomass, Wood, Paper
    • Batteries
  • Services
    • Services
    • Bulk Material Testing
    • Site Visit
    • Discrete Element Modeling (DEM)
    • Conceptual & Functional Engineering
    • Structural & Mechanical Engineering
    • Physical & Analytical Modeling
    • Moisture Migration & Caking Analysis
    • Bulk Handling Equipment Design & Supply
    • Education & Training
    • Expert Witness & Litigation Support
    • Material Tester Supply
  • Knowledge Base
    • Knowledge Base
    • Insights
    • Technical Papers
    • Articles
    • Case Studies
    • Frequently Asked Question
    • Glossary of Terms
    • Bulk Materials
  • About Us
    • About Us
    • Contact Us
    • Our Team of Experts
    • Career Opportunities
  • Contact an Engineer
Home / Energy / Power / Coal

Engineering Case Studies

Quicksearch

Search Filters

  • Select an Industry
  • Biomass/Wood/Paper
  • Cement
  • Chemicals
  • Consumer Products
  • Energy/Power
  • Food & Beverage
  • Glass & Ceramics
  • Metals / Powdered Metals
  • Mining & Minerals
  • Pharmaceuticals
  • Plastics
  • Select a Solution
  • Select a Need
  • Address Process Non-Uniformity
  • Cure Segregation & Improve Blending
  • Investigate Silo or Equipment Failures
  • Reduce Product Non-Uniformity
  • Solve or Prevent Poor Flow
Case Study

Solving Transfer Chute Plugging at Power Plant

A leading power generation company operating a 600 MW coal-fired power plant recently started using coal ...

Case Study

Coal Feeding: Pressure-Sealing Solids Pump® Improves Feed

At Lone Star Industries’ Cape Girardeau, Missouri cement plant, reliable coal feed to the kiln ...

Case Study

Mt. Storm Station (Dominion) Coal Handling Problems Solved

The Need Dominion’s Mt. Storm ( Dominion ) Power Station in West Virginia has three coal-fired ...

Case Study

Preventing Bunker Fires at Wisconsin Service Pulliam Station

The Need Wisconsin Public Service’s Pulliam Station has six active units totaling 375 MW capacity.  ...

Case Study

Coal Handling Problems Solved at Northern States Power

The Need Northern States Power (NSP) has a 384 megawatt coal-fired power plant in Minneapolis, Minnesota ...

Jenike & Johanson

Corporate Headquarters
400 Business Park Drive
Tyngsboro, MA 01879

info@jenike.com

Solutions

  • Solve or Prevent Poor Flow
  • Reduce Product Non-Uniformity
  • Cure Segregation & Improve Blending
  • Investigate Silo or Equipment Failures

Resources

  • Insights
  • Technical Papers
  • Case Studies
  • Calendar

Quicklinks

  • Sending Samples
  • FAQ
  • Office Locations
  • Contact Us

Privacy Policy | Terms & Conditions

  • Follow us on LinkedIn
  • Follow us on Facebook
  • Watch us on Youtube
  • Follow us on Twitter

Site by Scout Digital